The Ultimate Checklist for Factory Relocation: From Planning to Execution

At Merritts, we understand that relocating a factory is a significant undertaking—one that requires meticulous planning, expert coordination, and flawless execution. Whether you're moving a single piece of machinery or a full-scale production line, our priority is to ensure minimal disruption, complete safety, and a smooth transition to full operational capacity at your new site.

Ultimate Checklist for Factory Relocations

With over 100 years of industry experience, we provide a comprehensive turnkey factory relocation service. From the initial planning stages right through to final commissioning, we take care of every detail—so you don’t have to.

Phase 1: Strategic Planning and Preparation

Defining the Project Scope

We begin by identifying all machinery and equipment to be relocated. We work with you to establish clear objectives, timelines, budgets, and any specific operational requirements.

Conducting Site Surveys

Our team carries out detailed surveys of both your current and new premises. We assess access routes, floor load capacities, layout compatibility, and utility requirements—ensuring we fully understand the logistics involved.

Appointing a Dedicated Project Manager

You’ll be assigned a dedicated Merritts project manager who will coordinate every aspect of your relocation. They act as your single point of contact, ensuring clear communication and smooth project progression from start to finish.

Developing a Detailed Project Plan

We use site plans and layout drawings to produce a comprehensive project schedule. Our Gantt charts detail each phase of the move, and we always include contingency plans to mitigate any potential risks.

Phase 2: Compliance and Risk Management

Health & Safety Compliance

Safety is our top priority. We prepare detailed risk assessments and method statements for every job. All work is carried out in full compliance with relevant regulations.

Securing Permits and Access Arrangements

Where required, we handle the process of obtaining road closures, traffic regulation orders, and escort services. We also liaise with local authorities to ensure seamless movement with minimal disruption.

Comprehensive Insurance

We offer full insurance coverage throughout the relocation process, giving you peace of mind that your assets are protected every step of the way.

Phase 3: Decommissioning and Disconnection

Safe Equipment Disconnection

Our experienced engineers can safely power down and isolate all utilities. We carefully label and document everything to simplify reinstallation at the new site.

Dismantling and Protection

All machinery is dismantled following manufacturer specifications. We can provide protective treatments such as anti-corrosion coatings and create custom crates to ensure safe and secure transport.

Phase 4: Transportation and Logistics

Specialist Transport Solutions

We operate our own fleet of specialist vehicles—including low loaders, lorry-mounted cranes, and flatbed trailers—designed to move heavy and sensitive machinery with maximum care and efficiency.

Clear Communication Throughout

Our logistics team maintains real-time communication with all stakeholders, ensuring full transparency and coordination at every stage of the move.

Phase 5: Reinstallation and Commissioning

Precise Positioning of Equipment

Once on site, we offload and position machinery to the exact specifications of your new factory layout. Our team uses precision alignment and levelling techniques to ensure optimal performance.

Commissioning Assistance

Our experienced engineers can seamlessly support OEM engineers during the final commissioning phase, providing expert assistance with machine alignment, connections, functional testing, and ensuring full operational readiness.

Why Choose Merritts?

We offer a fully managed factory relocation service that’s tailored to the needs of your business. From specialist equipment handling to dedicated project management, we provide everything required to deliver a safe, efficient, and stress-free relocation.

  • Our key benefits include:
  • Dedicated project management from start to finish
  • Full compliance with health & safety regulations
  • A modern fleet of specialist lifting and transport equipment
  • Flexible scheduling, including weekends and out-of-hours
  • Secure interim storage facilities if needed

Ready to get started?

Let’s make your factory relocation a success. Contact us today to arrange a site visit and start building a tailored relocation plan that works for your business.