Merritts were appointed to provide lifting equipment and an installation team to offload and install new packaging manufacturing machinery for a leading provider of paper-based packaging. The project was carried out over a 13 week period.

Resources Utilised

Equipment:

JMG MC580 Pick& Carry Crane
JMG MC160 Pick & Carry Crane
Versa-Lift 60/80
Versa-Lift 25/35
7Te rated forklift trucks
3Te rated forklift trucks
MEWPs
Rigging Tackle

Personnel:

As well as a dedicated project manager and a health and safety manager, a crew of up to 8 multi-skilled operatives was utilised throughout the project. This consisted of:

Foreman
Mechanical Fitters
Lead Riggers
HGV Drivers

 

Services Provided:

Dedicated project manager
Health & safety documentation
Organisation of trackway installation
Provision of lifting equipment and rigging services to safely offload machinery from delivery transport
De-crating and unpacking of the machinery
Skating of machinery into position
Building of machinery
Assist OEM engineers with commissioning of the machinery
Assisting with the installation of services steelwork
Weekend working

Health and Safety

Working under CDM regulations for the project duration, the Merritts health & safety team ensured the correct documentation and systems were in place to provide a safe working environment:

An in-depth site survey was carried out to understand potential site-specific hazards.

Risk assessments, method statement and detailed lift plans were created and approved before commencement of works.

All Merritts’ plant, lifting equipment and machine moving tackle is regularly tested and fully certificated.