Merritts were appointed to provide lifting equipment and an installation team to offload and install new packaging manufacturing machinery for a leading provider of paper-based packaging. The project was carried out over a 13 week period.
As well as a dedicated project manager and a health and safety manager, a crew of up to 8 multi-skilled operatives was utilised throughout the project. This consisted of:
Working under CDM regulations for the project duration, the Merritts health & safety team ensured the correct documentation and systems were in place to provide a safe working environment:
An in-depth site survey was carried out to understand potential site-specific hazards.
Risk assessments, method statement and detailed lift plans were created and approved before commencement of works.
All Merritts’ plant, lifting equipment and machine moving tackle is regularly tested and fully certificated.
All Merritts operatives undertake an on-going training and development program to promote multi-skilling and safe working practices
I wanted to pass on my thanks to yourselves and the Merritts team for all your support with the project. I think I speak on behalf of everyone on site when I say that the personnel you’ve had here have been outstanding. It has been said on numerous occasions that not only is their willingness and quality of work fantastic, but they also ensured the job was carried out safely